After Shengli Kaifa NO.1 being put into use, Shengli Kaifa No.2 mobile production platform operated very well and all the design requirements are met. It has made great contribution to the development of Shengli offshore oil production.
Main Deck£º60 ¡Á 22m
Sinking Pad£º56¡Á22 ¡Á 2m
Capacity of Oil Tank£º1000m3
Working Depth in Water £º5¡«9m
Ability of Self-living £º20days
Amount of Member£º10 people
Limited Time of Using £º15years
¡¡
¡¡
All Rights Reserved£ºOffshore Engineering & Equipment Research Institute Address£ºNo.827 North One Road ,Dongying City ,Shandong Province,China